How to Test Solar Panels: A Practical Guide for Electricians
From open-circuit voltage and short-circuit current to insulation resistance and ground faults, here's how to test a solar PV installation, understand the readings and find out what's wrong when they don't add up.

Imagine you've just finished installing a solar PV system. The panels are mounted, the cables are connected and the inverter is ready to go.
You connect your tester to the first string. Everything looks good.
The second string? Perfect.
The third produces the expected voltage, but significantly less current.
So what's gone wrong? A faulty panel? Damaged wiring? A poor connection? Or has a cloud simply appeared at an inconvenient moment?
This is where solar PV testing becomes interesting.
Taking a measurement is relatively straightforward. Understanding what the result means, and deciding what to investigate next, requires considerably more knowledge.
And as solar modules become larger, string currents increase and module-level electronics become more common, conventional approaches to testing are being challenged.
In this guide, we'll explore the essential measurements, the faults they can reveal and the techniques that can make commissioning and fault-finding faster, safer and more reliable.
1. Before testing: know what you're dealing with
Solar PV testing starts long before anyone connects a test lead.
First, you need to understand the installation.
How many modules are connected in each string? What are their electrical characteristics? How are the strings routed and connected? Are power optimisers or rapid shutdown devices installed?
Without that information, interpreting the results becomes an exercise in educated guesswork.
The module datasheet and string design are particularly important. They establish the electrical characteristics you should expect, including open-circuit voltage, short-circuit current and the effect of temperature.
Start with a visual inspection
Before carrying out electrical measurements, inspect accessible parts of the installation.
Look for damaged cables, inadequate cable support, unsuitable or mismatched DC connectors, signs of overheating, moisture ingress and defects in earthing and bonding arrangements.
Check that equipment is correctly identified, suitable for the installation and installed according to the manufacturers' instructions.
A damaged connector discovered during inspection is considerably easier to investigate than a mysterious fault discovered after commissioning.
Understand the DC hazards
Unlike a conventional electrical circuit, PV modules may continue generating hazardous voltages while illuminated.
Switching off the inverter or opening a DC isolator doesn't remove the voltage produced by the modules.
DC arcs are another significant hazard, particularly when disconnecting current-carrying circuits.
Electricians must follow suitable safe-working and isolation procedures, verify the condition of the installation and use instruments and accessories rated for the voltages and currents involved.
Short-circuit current tests, in particular, require suitable equipment and the prescribed test procedure. Never improvise by shorting PV cables with ordinary test leads.
Which standards apply?
BS EN 62446-1:2016+A1:2018 is the current UK-adopted standard for documentation, commissioning tests and inspection of grid-connected photovoltaic installations. BSI lists it as current and under review at the time of publication.
Category 1 is the baseline test regime for all systems. Category 2 adds assessments such as I–V curve measurement and infrared inspection. These test categories are separate from the CAT safety rating marked on an instrument.
Relevant requirements of BS 7671 and equipment manufacturers' instructions must also be considered.
It's useful to distinguish three different objectives:
Safety: Is the installation correctly constructed and adequately insulated?
Electrical verification: Are the individual strings producing the expected measurements?
Performance: Is the installation delivering the output expected under its operating conditions?
A system might satisfy one objective without necessarily satisfying the others.
2. The essential solar PV commissioning tests
The starting point is a series of measurements that establish whether the installation has been correctly connected and is electrically sound.
The checks below explain the main DC measurements. Complete commissioning also includes the applicable AC verification, combiner-box checks where relevant, and functional tests of switching, controls and inverter operation. The standard allows string-current verification by short-circuit or operational-current testing; select the permitted method for the system.
Protective conductor continuity
Where protective conductors or protective bonding connections are required, their continuity must be verified.
This may include relevant module frames, mounting structures and other exposed-conductive-parts, according to the installation design and equipment requirements.
The objective is to establish that the necessary protective connections are electrically continuous.
However, electricians shouldn't confuse protective earthing and bonding with intentionally connecting the live DC conductors to earth.
Nor should they assume that every module frame requires an identical earthing arrangement. The equipment classification, design and applicable requirements determine what is necessary.
Specialist multifunction PV testers can incorporate a low-resistance continuity measurement using a test current of at least 200 mA.
Polarity: have positive and negative been mixed up?
Solar PV modules are typically connected in series to obtain the DC voltage required by the inverter.
Incorrect polarity can damage equipment or create dangerous conditions.
Polarity verification establishes that the positive and negative conductors have been correctly identified and connected.
It's a straightforward check, but an important one to complete before connecting equipment that could be damaged by reversed polarity.
Open-circuit voltage: are all the modules connected?
Open-circuit voltage, or Voc, is the voltage measured across a module or string when it isn't delivering current to a load.
On a conventional series-connected string, individual module voltages add together.
For example, imagine ten identical modules, each with a rated Voc of 45 V.
10 × 45 V = 450 V
Under Standard Test Conditions, the string's expected open-circuit voltage would be approximately 450 V.
But what if the tester indicates 405 V?
That's enough of a difference to warrant investigation.
It might suggest a string configuration error, connection problem or an issue affecting one or more modules.
However, voltage alone cannot identify the defect.
And there's another important variable.
Why temperature changes the voltage
A solar module's open-circuit voltage generally increases as its cell temperature falls.
This has consequences for both testing and system design.
Let's assume our module has a Voc temperature coefficient of -0.25% per °C.
At a cell temperature of 5°C, the module is 20°C below the STC reference temperature of 25°C.
Its Voc would increase by approximately 5%.
Our ten-module string might therefore produce:
450 V × 1.05 = 472.5 V
Conversely, a warmer module will generally produce a lower open-circuit voltage.
These are illustrative calculations, but they demonstrate why the reading must be compared with the expected voltage under the actual conditions.
Cold-weather voltage is also important during design. The maximum predicted string voltage must remain within the ratings of connected equipment.
What electricians should remember: A voltage measurement is only useful when you know what voltage to expect.
Short-circuit current: is the string producing what it should?
The next important measurement is short-circuit current, or Isc.
This is the current produced by a module or string when its output is short-circuited under defined conditions.
Unlike voltage, the current of identical modules connected in series doesn't add together.
If ten identical modules each have a rated Isc of 14 A, the string's rated short-circuit current will also be approximately 14 A.
But current depends heavily on the amount of sunlight reaching the modules.
A string tested in bright sunshine may produce considerably more current than the same string tested under thick cloud.
This is why a low Isc reading doesn't automatically indicate a faulty panel.
It might simply indicate that the weather isn't cooperating.
Irradiance: comparing like with like
Solar modules are rated under Standard Test Conditions, or STC.
These use a solar irradiance of 1,000 W/m², a cell temperature of 25°C and a reference solar spectrum of AM 1.5.
Actual installations rarely operate under those exact conditions.
An irradiance reference cell measures the solar power falling on the array, allowing electricians to interpret electrical measurements in context.
Consider two identical strings:
| Measurement | String A | String B |
|---|---|---|
| Irradiance | 1,000 W/m² | 600 W/m² |
| Short-circuit current | 12.0 A | 7.2 A |
String B is producing only 60% of String A's current.
But it's also receiving only 60% of the irradiance.
Under this simplified example, both strings could be performing exactly as expected.
That's why irradiance measurement is valuable, especially when comparing strings or checking performance against manufacturers' data.
The reference sensor must also be positioned correctly, generally in the plane of the array and according to its instructions. A sensor lying flat on a roof while the modules are tilted may give a misleading comparison.
Modern test systems can also use module temperature measurements to estimate results under STC.
For bifacial modules, which can generate power from light reaching the rear surface, both front and rear irradiance may need to be considered.
The important lesson: Don't blame the solar panel until you've checked the sunshine.
Insulation resistance: finding faults that don't stop generation
A PV installation can produce electricity while hiding a serious insulation problem.
A cable might be damaged beneath a module, moisture could have entered a connector, or wiring may have been trapped against metalwork.
Insulation resistance testing helps establish whether the DC conductors are adequately insulated from earth.
The challenge is that the solar array can remain energised while the test is carried out.
This requires a suitable test instrument and an appropriate PV-specific procedure.
BS EN 62446-1 describes separate pole-to-earth measurements and a method using the DC poles connected together. The latter needs equipment and a procedure specifically suitable for safely making and breaking a PV short circuit.
The correct method must account for the installation and any connected electronics.
What insulation test voltage should you use?
The amended standard’s reference criteria for arrays up to 10 kWp are summarised below. Select the voltage band using 1.25 × rated array Voc at STC, not the instantaneous measured voltage. Fluke’s PV insulation-testing guidance also explains the voltage bands.
| 1.25 × array Voc at STC | DC test voltage | Minimum resistance |
|---|---|---|
| Below 120 V | 250 V | 0.5 MΩ |
| 120 V to below 500 V | 500 V | 1 MΩ |
| 500 V to 1,000 V | 1,000 V | 1 MΩ |
| Above 1,000 V | 1,500 V | 1 MΩ |
This summary is for arrays up to 10 kWp. Larger arrays require the assessment arrangements in clause 6.7.3.3. Apply the complete test method and connected-equipment instructions, including isolation of the inverter and disconnection of equipment such as surge protective devices where required. Do not apply these test voltages indiscriminately to optimisers or other electronics. The PVCHECKs-ONE does not provide the 1,500 V test and must not be connected beyond its 1,000 V input rating.
There's an important distinction between the minimum acceptable result and the reading you would normally expect from a healthy installation.
An insulation measurement might exceed a specified minimum yet still be significantly lower than previous readings.
That could be useful information when investigating deterioration or intermittent moisture problems.
3. Troubleshooting: what do the readings tell you?
This is where understanding the relationship between measurements becomes useful.
No single reading tells you everything about a solar PV installation.
Instead, each result helps narrow down the possible explanations.
The PV fault-finding cheat sheet
| Unexpected result | Possible explanations | What to investigate |
|---|---|---|
| Voc lower than expected | Incorrect string configuration, temperature, wiring issue or module defect | Module count, datasheet, temperature and connections |
| Voc appears normal, Isc is low | Reduced irradiance, shading, module mismatch or electrical defect | Irradiance, string comparisons and module condition |
| Insulation resistance is low | Damaged cable, moisture, connector defect or insulation breakdown | DC cabling, junction boxes and connectors |
| One string differs from neighbouring identical strings | Environmental difference, wiring error or module fault | Test conditions, module configuration and further diagnostics |
| Inverter reports an insulation fault | Insulation defect, moisture ingress or equipment-related issue | Inverter information, permitted test procedure and insulation measurements |
| I-V curve contains steps | Shading, bypass diode operation, mismatch or module damage | Shading, module condition and curve comparison |
These are starting points for diagnosis, not proof of a particular fault.
A worked example: three strings, one problem
Let's return to our installation from the introduction.
Three identical strings have been installed on the same roof, facing the same direction and at the same angle.
During commissioning, the electrician records:
| String | Voc | Isc |
|---|---|---|
| A | 450 V | 13.8 A |
| B | 451 V | 13.6 A |
| C | 449 V | 8.1 A |
The open-circuit voltages are remarkably consistent.
But String C is producing considerably less current.
Does that mean it's faulty?
Not necessarily.
The first step is to verify the test conditions. Was String C shaded? Did irradiance change while the measurements were being taken? Were the measurements made using the same arrangement?
If the environmental conditions were comparable, the electrician has a stronger reason to investigate String C further.
Visual inspection, suitable additional measurements, thermal imaging or I-V curve tracing might help establish the cause.
The key is to investigate systematically rather than start disconnecting modules at random.
When an inverter reports an insulation fault
Another common scenario occurs when an inverter refuses to start or reports a DC insulation fault.
The fault message is useful, but it doesn't necessarily tell you where the problem lies.
It could involve moisture in a connector, damaged wiring, a module defect or another issue within the installation.
Intermittent faults can be particularly frustrating.
A damp morning might reveal an insulation problem that becomes less apparent after the installation dries out.
The electrician needs to establish the conditions under which the fault occurs, consult the inverter manufacturer's information and select an appropriate testing method.
An insulation resistance measurement can confirm whether a problem exists, but locating the defect may require further investigation.
Ground fault location: finding the problem without dismantling everything
Imagine an insulation test indicates a problem in a string containing twenty modules.
The modules are mounted on a roof, with most of the wiring hidden beneath them.
Where do you look?
One approach is to divide the installation into sections, where this can be done safely, and perform further measurements.
Specialist test instruments can also include a Ground Fault Locator (GFL) function.
This uses electrical measurements to estimate the position of a low-insulation fault within a string.
It can help narrow down the part of the array requiring closer inspection.
However, it is a diagnostic aid. The accuracy of the result depends on the electrical arrangement, the nature of the fault and the conditions specified by the instrument manufacturer.
Watch: Fault Finding in Solar PV Systems – PV-ISOTEST demonstration
4. Beyond voltage and current: understanding solar performance
So far, we've concentrated on measurements used to establish safety and basic string condition.
But there's an important distinction between a string that produces the expected open-circuit voltage and short-circuit current, and one that delivers the expected power.
What's the maximum power point?
A solar module produces different combinations of voltage and current depending on its operating conditions.
At open circuit, voltage reaches Voc but current is zero.
At short circuit, current reaches Isc but voltage is approximately zero.
In both cases, the electrical power delivered to an external load is zero.
Somewhere between those two points is the combination of voltage and current that produces the maximum power.
This is called the maximum power point, or MPP.
The relationship is:
Pmax = Vmp × Imp
Where Vmp is the voltage at maximum power and Imp is the current at maximum power.
For example, a module operating at 35 V and 12 A at its maximum power point produces:
35 V × 12 A = 420 W
Inverters use maximum power point tracking, or MPPT, to seek an operating point that maximises the power harvested from the PV array.
Understanding MPP helps explain why voltage and current measurements taken at the extremes of a module's characteristic don't reveal its full performance.
What is an I-V curve?
An I-V curve shows the relationship between a module or string's current and voltage over its operating range.
A healthy curve has a characteristic shape, with a relatively flat current region followed by a bend, often called the knee, before reaching open-circuit voltage.
The maximum power point sits near that knee.
A curve that differs from the expected shape can provide clues about problems that aren't obvious from individual measurements.
For example:
Steps or notches may indicate shading, module mismatch or bypass diode operation.
Lower-than-expected current may indicate reduced irradiance, shading or module deterioration.
Excessive resistance in wiring and connections can affect the shape of the curve and reduce maximum power.
Intermittent connections may produce unstable or irregular measurements.
These symptoms need careful interpretation, particularly because environmental conditions and measurement errors can produce misleading results.
IVCK testing versus full I-V curve tracing
It's important not to confuse the two.
An IVCK test combines key commissioning measurements, principally Voc and Isc, and may compare the results with expected values using module data and environmental measurements.
A full I-V curve tracer measures the current-voltage relationship across the operating range, providing considerably more information about how the string behaves.
Both are useful, but they answer different questions.
IVCK testing supports efficient commissioning and basic verification.
I-V curve tracing is particularly useful when investigating performance problems, commissioning larger arrays or examining suspected module and connection defects.
Watch: Avoid BIG Mistakes with These New Solar Testers! – PVCHECKs-PRO and IV600 demonstration
What about thermal imaging?
Electrical tests aren't the only way to investigate PV installations.
A thermal camera can help identify abnormal heating in modules, connectors, junction boxes and other components.
Hotspots may result from shading, damaged cells, high-resistance connections or other defects.
But thermal imaging must be performed and interpreted under suitable conditions.
Irradiance, wind, reflections and viewing angle can all influence the image.
A hotspot indicates an area that warrants investigation, rather than proving a particular fault.
For practical preparation, FLIR explains how inspection conditions affect solar thermal images.
Thermal imaging complements electrical testing. It doesn't replace it.
5. Why modern solar installations need different testing methods
The electrical characteristics of solar installations have changed considerably.
Larger modules, including bifacial designs, can produce higher currents. Commercial installations may use strings operating at higher voltages. Power optimisers and rapid shutdown devices introduce additional electronics into the DC system.
All of this affects how electricians select test equipment and interpret measurements.
Higher-current modules
As the output of solar modules increases, so do the current ratings electricians may encounter.
Older PV test instruments may have limits that are unsuitable for some modern strings.
Our TIS 9000 review looks at another approach to testing solar installations.
It's therefore essential to check the maximum voltage and current ratings of the instrument against the installation.
The relevant limit isn't simply the number printed prominently on the front of the tester. Different test functions and connections may have different restrictions.
Why power optimisers complicate testing
Conventional series-connected modules behave in a relatively predictable way.
Power optimisers and rapid shutdown devices can change that behaviour, particularly when the system is disconnected from the inverter or operating in a shutdown state.
The voltage measured across an optimiser-equipped string may not resemble that of a conventional string containing the same number of modules.
Insulation resistance testing can also become more complicated.
In some arrangements, applying a conventional insulation test may be inappropriate or may not give a meaningful result.
The correct procedure depends on the specific electronics and their manufacturers' instructions.
For example, SolarEdge’s isolation-fault guidance sets out procedures for its own equipment. These should not be assumed to apply to a different manufacturer’s system.
Testing strings with module-level electronics
Some newer multifunction testers incorporate dedicated procedures for compatible optimiser and rapid shutdown arrangements.
For example, the HT Instruments PVCHECKs-ONE incorporates an OPT function designed to carry out insulation resistance testing on compatible strings incorporating module-level power electronics, without disconnecting the individual devices from their modules.
But this isn't a universal insulation test.
The test arrangement and operating conditions must match those specified by the instrument manufacturer and the module-level electronics manufacturer.
The PVCHECKs-ONE manual distinguishes two OPT arrangements. With compatible rapid-shutdown devices, it specifies a maximum circuit current of 1 A. The non-RSD optimiser procedure uses a fixed 100 V test. A satisfactory result at 100 V does not establish a pass at a required 500 V or 1,000 V test. Use the procedure approved by both manufacturers; the ordinary MΩ function is not intended for strings containing these electronics.
That distinction is one of the most significant developments in modern PV test equipment.
6. Bringing the tests together: multifunction solar testers
We've explored the individual measurements and how electricians can use them to assess an installation.
In practice, carrying out these tests with separate instruments can involve repeated connections, multiple pieces of equipment and considerable time.
Modern multifunction solar testers bring many of these measurements together.
The latest instrument we've evaluated is the HT Instruments PVCHECKs-ONE, available in the UK through Test Instrument Solutions (TIS).
Its IVCK function measures Voc up to 1,000 V and Isc up to 30 A. Those limits do not apply indiscriminately to every function: the OPT restrictions described above are different. Check the selected function, accessories and maximum predicted string values before connection.
Its capabilities include polarity verification, Voc and Isc measurement, protective conductor continuity, insulation resistance, ground fault location and testing of compatible strings containing optimisers or rapid shutdown devices.
With suitable accessories, it can also measure irradiance and temperature, including front and rear irradiance for bifacial installations.
One useful feature is the ability to carry out several commissioning checks through a coordinated test process.
It allows supported test results to be stored and compared between strings. OPT results cannot be saved in the instrument’s memory, so record those separately as part of the job documentation.
Why recording the results matters
Commissioning doesn't end when the tester displays a satisfactory reading.
The results need to be associated with the correct string or circuit and recorded as part of the installation documentation.
Good records should identify what was tested, the relevant design information, the measured values and the conditions under which the measurements were obtained.
That information becomes particularly useful when investigating a fault months or years later.
An original commissioning result can provide a reference against which subsequent measurements are compared.

Internal memory and reporting features can make this process more convenient, but accurate and complete documentation remains the electrician's responsibility.
Watch: Solar Panel Testing Has Moved On. Has Your Tester? – PVCHECKs-ONE
Learn more about the PVCHECKs-ONE from TIS:https://hub.efixx.co.uk/PVCHECKs
Watch the complete eFIXX Solar PV Testing series
Over several years, we've explored solar PV testing using different generations of specialist test equipment.
The four videos below demonstrate the principles discussed throughout this guide.
Open the complete solar PV testing playlist on YouTube
Solar PV Testing Explained | Commissioning & Fault Finding
Solar Panel Testing Has Moved On. Has Your Tester? The latest PVCHECKs-ONE and the challenges of higher-current modules, optimisers and rapid shutdown devices.
How NOT to Test Your Solar Installation! Polarity, open-circuit voltage, short-circuit current, irradiance and IVCK testing.
Fault Finding in Solar PV Systems. Insulation resistance, ground fault location and additional insulation measurements.
Avoid BIG Mistakes with These New Solar Testers! Higher-capacity systems, multifunction commissioning and I-V curve tracing.
Together, they provide practical demonstrations of the essential tests, from basic string verification to more advanced fault-finding.
What good solar testing tells you
Modern solar installations demand more than a quick voltage check and a green light on the inverter.
Electricians need to understand how the modules should behave, how environmental conditions affect the readings and which measurements can help identify defects.
The most useful approach is systematic: establish the expected results, verify the test conditions, take the appropriate measurements and investigate anything that doesn't add up.
The latest generation of multifunction solar testers can make that work faster and more convenient, particularly on installations containing modern module-level electronics.
A tester can only tell you what's happening electrically.
Understanding the installation tells you why.